NEWS

BISHOPS SQUARE

Bishops Square is a 5 storey existing office block located on Kevin Street Dublin 8. Stewart Construction will expand the offices with an additional 5154m2 which will consist of expanding the floorplates of the existing top two floors and adding an additional 6th floor to the building.

Bishop’s Square office development is situated at the corner of Kevin Street Lower and Redmond Hill (R114) on a busy city centre thoroughfare. The existing 5 storey building is occupied by multiple tenants who will remain in place during the proposed expansion works. NVM Limited have provided a continuous monitoring program for this project which includes environmental noise and occupation noise monitoring within the existing businesses which operated continuously during the project.

 

Read More: http://www.stewart.ie/portfolio/47-bishops-square-dublin-2-office-extension/

Need an Environmental Monitoring Expert?

Talk to our team about your project requirements.

More updates from NVM

Blog

Ireland’s Environmental Review for 2025 and the Outlook for 2026

Ireland’s environmental record in 2025 was not defined by a single dramatic climate event. Instead, it was shaped by a steady accumulation of pressure: higher average temperatures, longer dry spells, intense rainfall, and repeated flooding in places already exposed. These conditions did not represent anomalies. They reflected a changing baseline,

Read More »
Blog

NVM: Supporting National Climate Monitoring with Met Éireann

Accurate, localised environmental data is the foundation for effective decision-making across agriculture, infrastructure, climate science and public safety. For Ireland’s national meteorological service, Met Éireann (https://www.met.ie/), the reliability of this data depends not only on advanced instrumentation, but on consistent, expert management of monitoring infrastructure on the ground. The NVM

Read More »
Blog

Environmental Monitoring Supporting Accelerated Residential Delivery

  Best practice for protecting the environment and ensuring strong community engagement  – Noel Carr, Director with NVM Limited   Delivering housing at speed is now a national priority. Local authorities and approved housing bodies are being challenged to bring forward serviced land, mobilise delivery teams, and accelerate construction –

Read More »