South Western Catchment Flood Risk Assessment and Management (CFRAM) Study

In November 2011 the Office of Public Works (OPW) appointed Mott MacDonald Ireland to carry out the South Western Catchment Flood Risk Assessment and Management (CFRAM) Study. The South Western CFRAM Study is part of the National CFRAM Programme. The CFRAM Programme is central to the Government’s medium to long term strategy for the mitigation and management of flood risk in Ireland. The aim of the study is to identify areas at significant risk of flooding and to propose measures that will manage the flood risk in those areas. Clonakilty was identified as one of the areas at significant risk from flooding. Ward and Burke contractors were awarded the contract to undertake this work and from there enlisted NVM Limited to provide a live web based portal to monitor vibration and noise levels during piling and excavation works through the project duration. Over 15 monitoring devices were installed to measure multiple locations simultaneously with on line access to the data and alert notifications should any exceedance of predetermined thresholds occur, both this  remote monitoring setup and with a hands approach to project assessments is making this a real challenging project for 2019…. https://www.opw.ie/en/flood-risk-management/operations/flooddefenceschemes/clonakiltyfloodreliefscheme/

Need an Environmental Monitoring Expert?

Talk to our team about your project requirements.

More updates from NVM

Blog

EPA Research Funding Reveals the Next Frontier of Environmental Regulation

The Environmental Protection Agency has awarded €6.5 million to 24 research projects under its 2025 research call.  University of Galway secured eight of the awards, with other successful institutions including University College Cork and Technological University Dublin. The funded themes include peatland monitoring, methane sources and sinks, national policy impacts

Read More »
Blog

Construction Vibration Monitoring in Practice

Construction vibration monitoring is a practical, evidence-led discipline focused on managing risk in live construction environments. Activities such as piling, demolition, ground improvement, and heavy plant operation inevitably generate vibration. Without structured monitoring, these vibrations can pose risks to nearby buildings, buried services, sensitive infrastructure, and the people who live

Read More »